ироове it report shows that, for a given year, the levelized cost of energy (LCOE) of new construction projects epected to be 80.0545 per kVih for solar energy and $0.0995 per kWh for geothermal energy Which form of gy nas a better LCOE?. (1 point)

Based on the provided information, geothermal energy has a better LCOE compared to solar energy. Geothermal energy has an LCOE of $0.0995 per kWh, which is lower than the LCOE of solar energy at $0.80545 per kWh. Therefore, geothermal energy is the more cost-effective option in terms of levelized cost of energy for new construction projects.