Laila is laying a path down for a new driveway.

Laila is laying a path down for a new driveway. She starts by measuring the area where the path will be and marks the boundaries with stakes and string. Then, she uses a shovel to remove the grass and topsoil from the path area. Laila makes sure to create a level surface by smoothing the ground with a rake.

Next, Laila lays down a layer of gravel to create a stable base for the driveway. She spreads the gravel evenly over the path area and uses a tamper to compact it down. Laila repeats this process with another layer of gravel, compacting it down again to ensure a solid foundation.

Once the gravel base is prepared, Laila starts laying the pavers. She chooses a pattern she likes and begins placing the pavers on top of the gravel, starting from one end of the path and working her way to the other. Laila makes sure to leave a small gap between each paver for drainage and expansion.

To secure the pavers and create a more stable surface, Laila applies a layer of sand over the top. She spreads the sand evenly and then uses a broom to sweep it into the gaps between the pavers. This helps to lock them in place and provide a smoother finish.

Finally, Laila uses a compactor or a tamper to settle the pavers into the sand and create a solid surface. She may also add an edging material along the sides of the path to keep the pavers in place and give the driveway a finished look.

Overall, laying a path for a new driveway involves preparing the area, creating a stable base with gravel, laying the pavers in a pattern, filling the gaps with sand, and compacting the surface. Laila ensures that the path is level, sturdy, and visually appealing.