Questions LLC
Login
or
Sign Up
Ask a New Question
Linear programming
Page 4
Questions (304)
A company makes two types of garage doors, type A and type B. Profit per unit is $20 for type A door and $15 for type B door.
3 answers
asked by
Ayansa Dabesa soboka
50 views
A firm manufactures tables and desks. To produce each table it requires 1 hour of labour, 10 square feet of wood, and 2 quarts
3 answers
asked by
Ayansa Dabesa soboka
32 views
Minimize z = 3x + 6y subject to:
4x + y ≥ 20 x + y ≤ 20 x + y ≥ 10 x ≥ 0 y ≥ 0 Graph the feasibility region. Identify
2 answers
asked by
nmh
480 views
A company is planning to purchase and store two items, gadgets and widgets. Each gadget costs $2.00 and occupies 2 square meters
1 answer
asked by
nmh
492 views
Maximize z = 16x + 8y subject to:
2x + y ≤ 30 x + 2y ≤ 24 x ≥ 0 y ≥ 0 Graph the feasibility region. Identify all
1 answer
asked by
nmh
1,158 views
Use simplex method to solve
Maximize p = 30x + 20y+30z subject to x + y+z <= 9 4x + 2y-2z <= 30 5x + 10y+3z <= 60 x, y, z >=0
2 answers
asked by
mashoo
670 views
SIMPLEX METHOD - Table:
Nutrient Peanuts Raisins M&Ms Pretzels Calories 855 435 1024 162 Protein 34.57 4.67 9.01 3.87 Fat 72.50
3 answers
asked by
Jay
692 views
3. (i) Sleak Teak builds yard furniture using hardwoods and (in a smaller shop)
handcrafted knick-knacks from the same sort of
1 answer
asked by
Michelle
394 views
Solve the linear programming problem by the simplex method.
Maximize P = 27x + 27y + 36z subject to x + y + 3z < 15 4x + 4y + 3z
2 answers
asked by
Leah
922 views
Solve the linear programming problem by the simplex method.
Maximize P = 10x + 6y subject to x + y < 80 3x < 90 x > 0, y > 0 x =
3 answers
asked by
Leah
1,760 views
Solve the linear programming problem by the method of corners.
Minimize C = 5x + y subject to x + 3y ≥ 43 x + y ≥ 27 x ≥ 0,
2 answers
asked by
Leah
1,286 views
Given the system of constraints, name all vertices of the feasible region. Then find the maximum value of the given objective
3 answers
asked by
Rabecca
66 views
solve this linear programming problem;
A chain saw requires 4 hours of assembly and a wood chipper 6 hours. A maximum of 48 hours
4 answers
asked by
ash
2,933 views
What point in the feasible region maximizes the objective function?Constraints:
3 answers
asked by
Rabecca
54 views
What point in the feasible region maximizes the objective function?Constraints: x≥0y≥0−x+3≥yy≤13x+1 Objective
3 answers
asked by
Rabecca
61 views
Assignment Problem 1*
Print Media Advertising (PMA) has been given a contract to market Buzz Cola via newspaper ads in a major
2 answers
asked by
Matt
519 views
Autoparts Inc. produces three types of parts' assemblies: (P,Q,R)and they each require (2,5,3) units of work on machine I and
1 answer
asked by
Jeff
362 views
Tab 1: Linear Program: 50 points
Consider the Linear Program: Max 2A + 3B s.t. 1A + 2B <= 6 5A + 3B <= 15 A, B >= 0 Use the
4 answers
asked by
Patrick
1,379 views
Graph the system of constraints and find the value of x and y that maximize the objective function.
constraints { x>=0 } { y>= 0
7 answers
asked by
John
40 views
Maximize P = x + 16y - z
subject to 2x + y + z 14 4x + 2y + 3z 28 2x + 5y + 5z 30 x 0, y 0, z 0
1 answer
asked by
Anonymous
445 views
using the graphical method solve the following linear programing problem maxmise objective function p=3x+y.subject to following
2 answers
asked by
judith
624 views
Please help this question is from my unit on linear programing and I'm having trouble completing it.
A company manufactures
2 answers
asked by
Maddy
850 views
Please help this question is from my unit on linear programing and I'm having trouble completing it.
A company manufactures
1 answer
asked by
Maddy
809 views
A student has 30 minutes to complete an exam. There are 9 multiple-choice questions worth 2 points each. There are also 3 short
3 answers
asked by
Valentina Tapatio
49 views
A student has 30 minutes to complete an exam. There are 9 multiple-choice questions worth 2 points each. There are also 3 short
3 answers
asked by
Valentina Tapatio
51 views
Use the following constraints and objective function to answer the next 3 questions.
x >/ 0 y >/ 0 -x + 3 >/ y y </ 1/3x + 1
3 answers
asked by
Valentina Tapatio
48 views
Maximize P = 16x + 80y subject to these constraints:
2x + 20y ≤ 430 4x + 70y ≤ 1400 8x + 30y ≤ 980 10x + 10y ≤ 1000 4x +
2 answers
asked by
JP
566 views
For the linear program
Max 2A + 7B s.t. A + B greater than or equal to 12 2A + 2 B less than or equal too 26 B greater than or
2 answers
asked by
Donna
583 views
Which of the following mathematical relationships could be found in a linear programming model? Choose YES if the relationship
3 answers
asked by
Donna
940 views
Which of the following mathematical relationships could be found in a linear programming model? Choose YES if the relationship
4 answers
asked by
Donna
1,103 views
For the linear program
Max 2A + 7B s.t. A + B ¡Ý 12 2A + 2 B ¡Ü 26 B ¡Ý 1 A, B ¡Ý Which of the following would be found
1 answer
asked by
Donna
396 views
set up the linear programming problem. Do not solve. A brewery manufactures three types of beer-lite, regular and dark. Each vat
2 answers
asked by
sha
546 views
minimize z= 5x + 9y
subject to 6x + y >= 18 2x + 3y >= 30 x<= 12 x,y>= 0 find the corner points, ans subject the objective
3 answers
asked by
sha
487 views
Note: Enter your answer and show all the steps that you use to solve this problem in the space provided.
What point in the
3 answers
asked by
Big Money$
101 views
how do i do linear programming in algebra 2?
2 answers
asked by
john
750 views
Explain the use of the objective quantity in linear programming.Give an example of an objective quantity that you would minimize
1 answer
asked by
Linda
416 views
Minimize w= y1+y2+4y3
subject to y1+2y2+3y3>=115 2y1+y2+y3<=200 y1+ y3>=50 with y1 >=0 y2>=0 y3>=0
3 answers
asked by
Tiffany
1,144 views
I need help finding constraints to put this on the graph. the objective function is c=16x+25y.
Problem: Your club plans to raisse
4 answers
asked by
preston jones
657 views
A manufacturer of downhill and cross-country skis reports that manufacturing time is 2 hours and 3 hours, respectively, per ski
3 answers
asked anonymously
35 views
Maximize z=16x + 8y subject to:
2x + y<30 x +2y<24 x>0 y>0
3 answers
asked by
Al
427 views
Please help...i'm totally lost with this one.
Construct a linear program for the following situation. Do not solve. A hotel is
4 answers
asked by
Jen
468 views
Posted by Anonymous on Wednesday, November 26, 2008 at 8:49pm.
P=-30x+25y Subject to 2x+3y>=30 2x+y<=26 -6x+5y<=50 x,y>=0 I need
2 answers
asked by
Damon
665 views
An electronics company manufactures personal tape players on which it makes a profit of $28 each and personal CD players where
2 answers
asked by
ROzina
559 views
Linear Programming
Your club is making boxes and plant hangers to sell as a fundraiser. Your profit is $10 for a box and $8 for a
1 answer
asked by
Carver
367 views
Given the system of constraints, name all vertices of the feasible region. Then find the maximum value of the given objective
3 answers
asked anonymously
77 views
Wal-Mart, a discount store chain, is planning to build a new store in
Rock Springs, Maryland. The parcel of land the company owns
1 answer
asked by
JYD
667 views
Describe the linear programming situation for this system of inequalities where you are asked to find the maximum value of
2 answers
asked by
Lucy
527 views
Describe the linear programming situation for this system of inequalities where you are asked to find the maximum value of
1 answer
asked by
Lucy
876 views
Describe the linear programming situation for this system of inequalities where you are asked to find the maximum value of
1 answer
asked by
Lucy
466 views
A farmer can plant a combination of two different crops on 20 acres of land. Seed costs $120 per acre for crop A and $200 per
2 answers
asked by
Lucy
885 views
Pages
1
2
3
4
5
6
7
Parent Categories (15)
Algebra
Algebra or Optimization
Business/Economics
Business/Production Analysis
Linear Algebra
Math
Mathematical Optimization
Mathematics
Mathematics/Operations Research
Operations research
Optimization
Optimization Problems
Optimization/Profit Maximization
Systems of Equations
Word problem