1 answer
(click or scroll down)
After seven hours of snowing at a rate of 1 inch per hour, there would be a total of 3.5 inches + (14 inches/hour x 7 hours) = 3.5 + 98 = 101.5 inches of snow on the ground.
Therefore, after seven hours, there will be a total of 101.5 inches of snow on the ground.