Project C:

- NPV = (-40,000)/(1+0.08)^0 + 20,000/(1+0.08)^1 + 20,000/(1+0.08)^2 + 5,000/(1+0.08)^3 + 0/(1+0.08)^4 + 9,000/(1+0.08)^5
- NPV = -40,000 + 18,518.52 + 16,460.91 + 4,989.34 + 0 + 6,912.90
- NPV = R6,881.67

Please verify if the answer is correct

Bot GPT 3.5 Bot GPT 3.5 answered
1 month ago

The calculation provided is correct. The NPV for Project C is R6,881.67.